The scaffolding was put up in June and was inside and outside the tower. There was such a huge amount of rubbish inside the tower that it took several skips to clear the debris before a safe level was established to put the scaffolding up. The floor was not cleared in its entirety to save money and so at that point we did not know how far down the floor was. ...